TMS PRE-PRODUCTION UPDATE 08-29-2014

Wilkinson County:

Halcón Fassman 9H-1, truck access road is located off Hwy 61 onto Sam Leake Road, then to Whetstone. Drilling complete with a reported 6,030' lateral. Premier should be finished fracking this weekend.

Halcón Shuckrow 10H-1, located on Sam Leake Road about 5 miles east of Hwy 61, H&P Rig # 623 spudded on July 31. Should be getting close.

Halcón S D Smith 1H, located on the Jackson Louisiana Road south of Woodville. H&P Flex 3 Rig# 249 completed a 7,556' lateral. Premier scheduled to frack this well next.

Halcón George Martens 1H, located beside the west side of the south lane of Hwy 61 south of Woodville a couple of miles. H&P Flex 3 Rig #249 on site to drill a planned 7,000' lateral. Spud 8-8-2014. Drilling away!

Goodrich CMR Foster Creek 24-13, access from Hwy 24 on Hiram McGraw Road to Macedonia Road, then to end of Helmer Road. Nabors Rig # 624 spudded May 30. Finished drilling about August 26. Nabobs moving to CMR-Foster Creek where 1 well is likely to be drilled.

Goodrich CMR-Foster Creek 8-H-1 and 2, access from 24 on Hiram McGraw Road to Macedonia Road, then a mike or so down Helmer Road. Expect Nabors Rig #624 to spud early next week.

Goodrich CMR/Foster Creek 31-22H-1, access from Hiram McGraw Road off of Hwy 24. Nabors X-17, Spud July 8. Drill reportedly finished in 35 days or less. Nabors X-17 moved to Goodrich Verberne 5H-1 well in Tangipahoa Parish. Fracturing operations should be underway shortly, if not already.

Sanchez Dry Fork East # 2H, drilling completed (again) with a 5,000 foot lateral. Rapad Rig#31 moving to Amite County St. Davis #1 site located on Kahnville Road south of Gloster, MS. Dry Fork East awaiting fracturing operations.

EnCana Pintard 28H-2, located roughly 3 miles north of Centreville off Macedonia Road- Trinidad Rig # 124 finished drill with 20,807' total depth and an approximate lateral length of 8,500'. Plugs should be drilled out and flow back should begin next week.

Comstock CMR Foster Creek 28-40 No. 1H, located on Will Floyd Road. Access appears to be south off of Hwy 563 on to Macedonia Road, then on to Netterville Road, then on to Will Floyd Road. Trinidad Rig # 103 began drilling on August 14. Should be about finished with the intermediate.

Amite County:

Sanchez St. Davis #1, accessed from Hwy 24 in Gloster, located down Kahnville Road about 6 miles southeast of Gloster. RAPAD Rig # 31 moving on site. Expect drilling to start this weekend or very early next week.

Encana Ash 13H-1 and 13H-2, Located on the east side of Ash Road, accessed via Lower Centreville Road about 3 miles southeast of Centreville. Trinidad Rig # 124 spudded July 21. Both -1 and -2 intermediates should be completed...first lateral should be well underway. If things go as planned, these wells could be completed by the middle of September.

Encana Lyons 35H-2- Located on same site as Lyons 35H-1, Fracturing operations complete on an estimated 5,000 foot lateral. Plugs drilled out. Flow back rumored to have started.

Encana Sabine 12H-1 and 12H-2, located off of Enterprise Road, south of Hwy 24 about 3 miles out of Liberty, access is from Hwy 48. Trinidad Rig # 125 spudded 12H-1 on June 20 and 12H-2 on June 23. Core sample operations have consumed most of the past three weeks. Drilling should be started in the first lateral. Preparations for fracturing already underway. If things go as planned drilling could be completed on these two wells by middle to late September.

Goodrich Spears 31-6H-1, Located on the recently completed C H Lewis site pad on the west side of Bates School Road north of Gillsburg. Ensign Rig #753, spudded July 22. Drilling rumored complete with a 6,500'+ lateral. Unsure where Ensign Rig #753 is headed next? Kent 41H is ready and waiting, but rumors were this rig was headed to a Little Silver Creek Field near the Blades 33H-1.

Goodrich Bates 25-24H-1, located roughly 2 miles northeast of Liberty off of Hwy 569 North. No word on lateral length, but expecting 5,000' or more. Fracking rumored to have successfully completed 19 of 19 stages...ex plugs to be drilled out and flow back shortly.

Goodrich Denkmann 33-28H-2, located in Amite County on the Mississippi/Louisiana line in T1N, R4E. Accessed from the Louisiana side through Weyerhaeuser roads off of Tolar Hurst/Parish Road 181 off of Hwy 1044 north of Hwy 38. Fracturing successfully completed on 22 of 24 stages. Flowing back for about a week.

St. Tammany: Permit pending

Washington Parish: Permits pending, site preparation underway.

Tangipahoa: Goodrich Verberne 5H-1, located south of Hwy 38 on Hwy 1061. Nabors X-17 spud 8-25. Surface casing finished. Should start into intermediate by tomorrow.

St. Helena Parish: Comstock pad being prepared...permit pending.

East Feliciana: Halcon Mt.Common Church field and TMS RA SUA permitted.

West Feliciana:

Halcon Walker drill, previously scheduled, has been delayed.

Lots happening in the TMS and it all appears to be positive.